RoofCostLookup.

Guide

Tear-off vs overlay

Replacing a roof two ways: strip it to the deck first (tear-off), or nail the new roof over the old one (overlay, also called a roof-over or re-cover). Overlay quotes come in lower. They are not the same job.

The price difference

Tear-off and disposal of one layer typically accounts for roughly $1.00–$2.00 per sq ft of the installed price — on a 2,000 sq ft roof, an overlay can quote $2,000–$4,000 lower. Our standard ranges assume tear-off; an overlay quote below the range is not automatically a bargain, it is a different scope.

What tear-off gets you

When an overlay can make sense

When it does not

Two existing layers, curled or brittle shingles, any sign of deck rot, sagging, or a premium material going on top (metal, tile and slate should never be overlaid — the weight and fastening assumptions fail). An overlay also adds the old roof's weight to the structure permanently.

The rule of thumb

If you plan to stay in the house, tear off. The saving is real but small against a 25–30-year asset, and the tear-off is the only moment anyone ever sees your deck. If a contractor pushes an overlay without an attic/deck check, that tells you something about the contractor.